Pursuant to Section 10.3.4 of the Maynard Protective Zoning Bylaws, the Planning Board established the following Schedule of Fees at its regularly scheduled meeting of May 24, 2016:

 

Site Plan Review

Pre-Application Meeting (mandatory) No fee
Application Filing Fee (if public hearing also responsible for cost of mailing postage and legal ads to be determined at a later time) $125 
Site Plan Review Housing: $500 + $50 / unit 
Non-Housing: $500 + $0.05 / sq. ft. 
Site Plan Review Modification Housing: $250 + $50 / new unit 
Non-Housing: $250 + $0.05 / sq. ft. of new area 
Concept Plan Review $2,500  
Peer Consultant Review Deposit – Engineering (separate check required) $5,000 (may require replenishment. Any remaining balance refunded.)
Peer Consultant Review Deposit – Design (applicability determined at pre-application meeting; Separate check required) $2,500

Note: For mixed-used development, either in single or multiple structures, fees shall be the sum of the fees of the individual uses.

  Public Hearing Required (Additional advertising and mailing costs may apply.)
  Town Meeting approval required

 

Subdivisions

Approval not Required $250 + $150 each new lot / created parcel
Preliminary Subdivision Plan $750 + $750 / lot created 
Definition Subdivision Plan (w/ Approved Preliminary Plan) $1,000 + $200 / lot created 
Definition Subdivision Plan (w/o Approved Preliminary Plan) $2,500 + $300 / lot created 
Amend / Modify a Definitive Plan $500 
Modification to Covenant, Approval, or other Subdivision Documents $250 
Peer Consultant Review Deposit – Engineering (separate check required) $5,000 (may require replenishment. Any remaining balance refunded.)
Peer Consultant Review Deposit – Design (applicability determined at pre-application meeting; Separate check required) $2,500

  Public Hearing Required (Additional advertising and mailing costs may apply.)
  Town Meeting approval required

 

Special Permit

Special Permit (Residential) $200 
Special Permit (Commercial) $200 per activity 
Sign Special Permit $150 
Cell Tower Special Permit $2,500 
Cell Tower Special Permit Renewal $2,500 
Special Permit Modification $200 
Zoning Amendment Request $1,000  

  Public Hearing Required (Additional advertising and mailing costs may apply.)
  Town Meeting approval required