Pursuant to Section 10.3.4 of the Maynard Protective Zoning Bylaws, the Planning Board established the following Schedule of Fees at its regularly scheduled meeting of May 24, 2016:
Site Plan Review
Pre-Application Meeting (mandatory) | No fee |
Application Filing Fee (if public hearing also responsible for cost of mailing postage and legal ads to be determined at a later time) | $125 |
Site Plan Review | Housing: $500 + $50 / unit Non-Housing: $500 + $0.05 / sq. ft. |
Site Plan Review Modification | Housing: $250 + $50 / new unit Non-Housing: $250 + $0.05 / sq. ft. of new area |
Concept Plan Review | $2,500 |
Peer Consultant Review Deposit – Engineering (separate check required) | $5,000 (may require replenishment. Any remaining balance refunded.) |
Peer Consultant Review Deposit – Design (applicability determined at pre-application meeting; Separate check required) | $2,500 |
Note: For mixed-used development, either in single or multiple structures, fees shall be the sum of the fees of the individual uses.
Public Hearing Required (Additional advertising and mailing costs may apply.)
Town Meeting approval required
Subdivisions
Approval not Required | $250 + $150 each new lot / created parcel |
Preliminary Subdivision Plan | $750 + $750 / lot created |
Definitive Subdivision Plan (w/ Approved Preliminary Plan) | $1,000 + $200 / lot created |
Definitive Subdivision Plan (w/o Approved Preliminary Plan) | $2,500 + $300 / lot created |
Amend / Modify a Definitive Plan | $500 |
Modification to Covenant, Approval, or other Subdivision Documents | $250 |
Peer Consultant Review Deposit – Engineering (separate check required) | $5,000 (may require replenishment. Any remaining balance refunded.) |
Peer Consultant Review Deposit – Design (applicability determined at pre-application meeting; Separate check required) | $2,500 |
Public Hearing Required (Additional advertising and mailing costs may apply.)
Town Meeting approval required
Special Permit
Special Permit (Residential) | $200 |
Special Permit (Commercial) | $200 per activity |
Sign Special Permit | $150 |
Cell Tower Special Permit | $2,500 |
Cell Tower Special Permit Renewal | $2,500 |
Special Permit Modification | $200 |
Zoning Amendment Request | $1,000 |
Public Hearing Required (Additional advertising and mailing costs may apply.)
Town Meeting approval required
NOTE: All fees are to be paid by Certified, Cashiers or Bank Check payable to the TOWN OF MAYNARD.